New Location

The needs of the community have grown and with that the Frontenac Children's Aid Society has too. The FCAS is moving to a new home in the Summer of 2012. The new facility now under construction and located at 817 Division Street, will allow us to become a hub of children's services offering an ideal solution for the families we serve. By combining all of our services in one facility, we will be able to provide an integrated service approach in the Kingston community ensuring the needs of our clients continue to be met.

The following principles provide an overview of the philosophical approach the Agency has employed in the design and construction of our new building. The project team and building:

  • Is designed to allow for further growth and/or future renovations,
  • Is family friendly and welcoming in its design,
  • Is designed and being constructed using environmentally sound practices to minimize the impact on the environment and will meet LEED Gold status,
  • Allows an opportunity for an integrated community service approach which wherever possible will welcome the provision of leased administration and service space to the appropriate community agencies and services,
  • Is completely accessible,
  • Be managed to ensure both a cost effective and efficient use of resources,
  • Engage key Society stakeholders, including the Board of Directors, staff, foster parents and other consumers.

October 2009

New Location New Location New Location Construction at our New Location

February, 2011

Our New Location Our New Location Our New Location Our New Location

May, 2011

Exterior wind load bearing steel stud framing has commenced at the east end of the building, May 13/11 In-slab radiant heat and cooling piping placed and basement concrete floor slab poured May 13/11 Masonry contractor has commenced with concrete block walls in basement level May 27/11 Structural steel framing nearing completion, floor and roof steel decking in progress May 27/11 Exterior galvanized steel trellis framing in progress to the south elevation fenced outdoor play yard May 27/11

June, 2011

Grey water cistern installed on north side of building with future connection to the storm sewer, June 3/11 In-slab radiant heat and cooling piping being placed under the Boardroom and Program Rooms June 10/11 In-slab radiant heat and cooling piping in place and concrete floor slab being poured under the Daycare June 24/11 Slab on grade rigid insulation in place and radiant heating and cooling piping in progress on the Ground Floor south elevation Access Rooms June 30/11 Exterior densglas sheathing is in progress on the northwest corner of the building June 30/11